Update for 2018-10-26

Heads–up: SATURDAY WORK on 10/27 includes painting inside the multi-purpose room.

Highlights: Seismic Strengthening of Multi-Purpose Bldg Completed

Concrete Poured for Kitchen Floor

Construction activities

  • Build exterior kitchen walls 10/24 - 11/9

  • Install sheetrock inside Multi-Purpose Bldg

Look ahead: Start framing kitchen roof 11/9

Image 2018-10-26 at 10.02.01 PM.png
Jim Carter III